![]() ![]() There would be no assessments for this work. These costs would be funded by City bonding. The total estimated project cost is $389,494.00. The proposed improvements would consist of milling 2 inches of the entire roadway and placing a new 2-inch bituminous wearing course. 5 th Street from Kinney Ave North to T.H.Knight Ave North from 6 th Street to 7 th Street.7 th Street from State Avenue North to T.H.#32.8 th Street from State Avenue North to Knight Ave North.9 th Street from State Avenue North to T.H.NORTHWESTERN RESIDENTIAL DISTRICT – PAVEMENT RESURFACING. ![]() There would be street assessments for recovery costs, for approximately $837,969.00 recovery total. These funds would be funded by City bonding. The total estimated cost for this work would be $1,558,615.00 Pedestrian ramps transitioning roadways to existing sidewalks to be constructed to include truncated domes, compliant to PROWAG standards (Minimum 48” PAR). Spot repair of sidewalk in failing or unsafe walk areas to be addressed and repaired. Curb and gutter replacement would consist of updating sections of old design square curb and gutter and any existing curb that retains more than 1” of water. Excess unnecessary material would be excavated and disposed (discretion of the city), and two new layers of bituminous material would be paved. The website uses 'cookies', which are elements of data that a website can send to your browser, which may then be stored on your system. The proposed improvements would consist of reclaiming 4” of bituminous material with 5” of Class 5 base material, providing a more unified layer of base material. Utilities in this project area deemed in need of improvement have been previously improved and are not within the scope of this proposed project. There have been multiple utility street service cuts made throughout the construction life of these Avenues, and they are due for reconstruction of the road from base material to the surface pavement. The above Avenues were last reconstructed in 1986 and consisted of 20” class #3 sub-base and 6” class 5 base construction, 2.5” of non-wear binder course, and 1.5” of wear course. Knight Avenue North from 4 th Street to 6 th Street, and 7 th to 9 th Street.Duluth Avenue North from 4 th Street to 9 th Street, excluding 6 th Street.Arnold Avenue North from 6 th Street to 9 th Street.State Avenue North from 3 rd Street to 10 th Street, excluding 6 th street.NORTHWESTERN RESIDENTIAL DISTRICT – STREET RECONSTRUCTION in the City Council Chambers at 405 East Third Street, Thief River Falls, MN to consider making the following improvements, located within the City of Thief River Falls, pursuant to Minnesota Statutes, Section 429.011 to 429.111:ġ. The City Council of Thief River Falls conducted a hearing on Tuesday, February 15, 2022, at 5:30 p.m. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |